PROJECTS
Island Bay Bridge Project

Gloucester Apartments
Scaff Equipment used for specialised design
-
Kwik Stage
-
Kedar Roof
Challenges
-
Scaff ties to balconies only
-
South elevation free standing
-
Connection between Kwik stage Scaff & Kedar roof
-
Kedar roof span 18.5m
-
Drive in rubbish chute
Note: At the time of photo scaffold may not be complete.


Catalina Bay
Scaff Equipment used for specialised design
-
T&C Scaff
-
530 Safe Smart Alloy Trusses
Challenges
-
Free standing Scaffold
-
Mono pitch roof free span 17.5m
-
High wind zone
Note: At the time of photo scaffold may not be complete.



JP Bird Cage
Scaff Equipment used for specialised design
-
Ring Scaff
-
Layher Trusses
Challenges
-
72m long x 18.5m high x 12.5m wide
-
Back prop level 1
-
Cantilever atrium elevation
Note: At the time of photo scaffold may not be complete.

UCSA Panel Propping
Scaff Equipment used for specialised design
-
Slim Shors
-
Ring Scaff
Challenges
-
13.5m high panels
-
Prop and support floating panels
-
Footing design for Raking Shors
Note: At the time of photo scaffold may not be complete.


Lauderdale Residential Units
Scaff Equipment used for specialised design
-
Layher All Round Scaff
-
Layher Trusses
Challenges
-
Tight site
-
Free Standing
Note: At the time of photo scaffold may not be complete.



Scaff Equipment used for specialised design
-
Tube & Clip
-
Layher Trusses
Challenges
-
Historic Building - No part of scaffold could touch the building
-
Free Standing
-
No room for ballast on road front All ballast placed in the garden bar
-
19.5m clear span of the roof
-
Cantilever box beam over the existing roof to pick up one corner of temp roof
Note: At the time of photo scaffold may not be complete.